Photo Gallery

Pan Pacific Hotel – Vancouver, BC

Previous to any work being started in the Suites, Cambridge Floors removed and disposed of all existing tile on floor, bathtub surrounds, and shower walls of suites. Leveling was done to the entire floor of the suites to ensure the tile would be completely level when installed. A new large format Porcelain Tile was installed by us in an off-set pattern on the entire floor of the suite, walls, pillars, sunken bathtub surround, steam shower floor, curb, and wall and bench seat.
PanPacificHotelThumbLarge

Vancouver Daycare Center

Cambridge Floors tested the current floor for Asbestos a daycare center in Vancouver because the building was very old, and there was a risk the previous flooring may have contained asbestos. The test came back positive for Asbestos. The sub-floor was prepped and re-sheeted with plywood. Forbo Marmoleum was supplied and installed with heat welded seams. Cambridge Floors installed a 4” Cove base through-out the daycare.
VancouverDaycareCenterThumbLarge

Maybury

Cambridge Floors supplied and installed engineered hardwood flooring in the den, family room, dining room, living room, entry and stairs. A textured carpet was supplied and installed on the stairs, hallway and in 3 bedrooms also. A 12 x 12 Porcelain Tile was installed in the Kitchen and Bathroom with a Ditra Anit-Fracture Membrane to prevent movement of the tile so the tile and grout lines don’t crack. After all the flooring was installed, we installed baseboards through-out the entire home and added a pony wall cap near the front entry that matched the floor.
MayburyThumbLarge

Shultz

Cambridge Floors removed and disposed of ceramic tile from the entry, vinyl and sub-floor from the powder room, kitchen and family room and all existing carpet. A self-leveling compound was used to level the previous subfloor. Engineered hardwood was supplied and installed by us into the living room, entry, dining room, bedrooms, kitchen and family room. Vinyl was supplied and installed by us into 3 bathrooms and the laundry room. After all the flooring was installed, we updated the light fixtures and electrical outlets through-out the entire home. We painted the entire interior of the home along with supplied and installed new Blinds through-out the house. A custom wall cap was stained to match the floor and installed by us. Once all other work was completed, we supplied and installed baseboards and door casings through-out the house.
ShultzThumbLarge

Bryant

Bathroom Reno Removal and disposal was done of the entire bathroom including vanity, toilet, bathtub, baseboards, door casings, one piece shower and vinyl flooring by Cambridge Floors. All bathroom fixtures were removed along with drywall on walls and ceilings to prepare for rewiring for new outlets and light fixtures. New plumbing was completed for the new bathtub. A self-leveling compound was used on the entire bathroom floor previous to any installation. New drywall on the walls and ceilings was installed. A 12 x 24 Porcelain tile was supplied and installed by Cambridge Floors on the bathroom floor, shower walls, and custom niche. A new toilet, bathtub, framed glass bathtub doors, bathtub fixtures, a custom made vanity, sink and fixtures, mirrors, lighting, electrical outlets, door casings, countertop and door and cabinet hardware was installed. We painted the walls and ceilings. Master Bedroom Cambridge Floors completed removal and disposal of existing carpet and baseboards and installed new carpet. Baseboards, door casings, light fixtures and a new ceiling fan was supplied and installed by Cambridge Floors as well as new paint on the walls and ceilings.
BryantThumbLarge
HTTP://WWW.CAMBRIDGEFLOORS.COM/WP-CONTENT/UPLOADS/2015/08/NFCA Click for the BBB Business Review of this Floor Coverings & Installation in Langley BC HTTP://WWW.CAMBRIDGEFLOORS.COM/WP-CONTENT/UPLOADS/2015/08/CHBA HTTP://WWW.CAMBRIDGEFLOORS.COM/WP-CONTENT/UPLOADS/2015/08/GLCOC HTTP://WWW.CAMBRIDGEFLOORS.COM/WP-CONTENT/UPLOADS/2015/08/ICC HTTP://WWW.CAMBRIDGEFLOORS.COM/WP-CONTENT/UPLOADS/2015/08/MOSCOC